The Construction of our Micro Apartment

More images will follow, but here is a little taste. The General Contractor is testing our foldable wall and bunk beds during construction.

The Beginning

Resource Furniture beds and lower cabinets are installed

Red cabinet and soffit cabinets are being installed

Bathroom/ medicine cabinet door

Sliding panel for painting is installed

All cabinets but movable kitchen island are in

Folding wall in front of bunk beds in open position