More images will follow, but here is a little taste. The General Contractor is testing our foldable wall and bunk beds during construction.
The Beginning
Resource Furniture beds and lower cabinets are installed
Red cabinet and soffit cabinets are being installed
Bathroom/ medicine cabinet door
Sliding panel for painting is installed
All cabinets but movable kitchen island are in
Folding wall in front of bunk beds in open position